Bayan Lepas
Job scope inclusive of labour to assist main contractor for piling works with hydraulic jack piling rig, construction of new reinforced concrete floor and RC box culvert and precast u-drain.
Client
Sanmina SCI System (M) Sdn. Bhd.
Kok Construction (M) Sdn Bhd
Year
May ’22 – Aug ’22
Size
–
Architecture
–
Project Valuation
–
Engineering Consultant
WK Consultant